History

TOA Timeline 2000-Present

2000

TOA (USA), LLC was established as a subsidiary of TOA Industries Co., LTD

CEO: Toshihiko Iizuka

President: Shinichi Iizuka

2001

Mass Production started

2002

72,000 ft² expansion of High-Bay Stamping area

2004-09

Expansion

2004

85,000 ft² expansion for Welding and Die Storage

2005

15,000 ft² office area expansion for Engineering and Quality departments

2006

58,000 ft² expansion of High-Bay Stamping area

2007

Acquisition of 23,000 ft² Service production and Warehousing facility

2010

Shinichi Iizuka became CEO of TOA (USA), LLC

Junichiro Kondo became President of TOA (USA), LLC

2013

Hot Stamping production started with a new 50,000 ft2 manufacturing building

2015

Began shipping in 100,000 ft2 “West” production control and distribution expansion

2016

Began production in 300,000 ft2 “East” manufacturing expansion

Hot Stamping area doubled with 73,000 ft2 expansion

2017

Cationic Electrodeposition coating capacity increased with 38,000 ft2 “E-COAT 2” expansion

Kuniaki Hasagawa became President of TOA (USA), LLC

Kazuo Murai became CEO of TOA (USA), LLC.

CURRENT:  158 acres – 1,000 employees – 1,070,000 ft2 manufacturing space